Environmental Forecasts Session
– forecasts of environmental impact,
– balance water needs
– hue of the environment
– noise sample
– groundwater quality to meet water quality ph
– discussion of efforts to manage environmental matrices
Began Pre-construction stage – Construction – Post kontstruksi
Review Of Licensing :
– land use permit
– Permit the allotment of space
– Peil flood
– Cemetery land
– Building permits
(reporting in every six month)
Cleaning And Landscaping Services
– More planted / propagated planting cover crops
– more open public facilities & social facility more than point
– driveway planted with tall plants 1 meter (in principle entrances min 6 meter)
– disposal systems (waste management)
Transportation Services :
– Amdal traffic
– coordination with street lighting to facilitate the handover public facilities and social amenities
Health Department
– groundwater qualit with the issue of what does not qualify
– periodic monitoring of larvae
/ effort to eliminate mosquito breeding
Integrated License Service Offices :
– worth checking line the road
– graveyard – In Formula (min 2% of the total land area)
– more closely the procedure of establishment of housing
– regulations of the local mayor
Office Building Residents & Empowerment Of Water:
– peil flood study
– There is 100 source of water infiltration
– there needs to be asked according to event
minister of local regulations
Fire Departement :
– make a hydran, water / special places pump which is intended only when the fire
Trade Services & Industrial Affairs :
– further confirms the procedure in marketing promotions
– NGOs society,
– Hiring local residents to participate
Apposition :
– Hal – hal yang harus di Perhatikan 🙂
– session was attended by representatives from all agencies
1. Need for coordination regarding water,
2. Ground transportation (party developers in coordination with side village
3. Employment for local residents
– if the thing – is or with some technical terms have not been appropriated by the Government can give warnings and warnings to stop the course of these activities in a project